| # | INDEPENDENT CHECKING ENGINEER | SERVICE START |
|---|---|---|
| 1 | Head of Project Planning and Scheduling Development Projects Under Regional Corridor Development Authority (Recoda) Development Agencies |
2020 |
| # | MONTHLY MONITORING, PLANNING, SCHEDULING & EOT SERVICES | SERVICE START |
| 1 | Pembinaan 6 Bilik Darjah, Asrama (200 Pelajar) Dan Lain-Lain Kemudahan Di Smk Engkilili, Lubok Antu, Sarawak (Reka Dan Bina) | 2023 |
| 2 | Pembinaan Gantian 18 Bd Dan Lain-Lain Kemudahan Di Smk Dalat, Dalat, Sarawak (Reka Dan Bina) | 2023 |
| 3 | Sejingkat Power Corporation 60mwac Battery Energy Storage System Project | 2023 |
| 4 | Jalan Medong / Lebrasau/ Kampung Klid Dalat Mukah Road Project | 2023 |
| 5 | Proposed Enhancement Of The Fire Fighting System At Miri Power Station | 2023 |
| 6 | Bunut To Medamit 275kv Transmission Line Project | 2023 |
| 7 | Pembinaan Gantian 12 Bd, Lima (5) Unit Rumah Guru Dan Lain-Lain Kemudahan Di Smk Sri Sadong, Simunjan, Sarawak | 2022 |
| 8 | Similaju To Bunut 500kv Transmission Line | 2022 |
| 9 | Project Pembinaan Rkat Tambahan Pelbagai Kelas Kem Baru 10 Sibu, Sarawak | 2022 |
| 10 | Substation Extension & Reinforcement Of Supply At Mambong 275/132/33kv Substation | 2022 |
| 11 | Enhancement Of Fire Fighting System At Sarawak Energy’s Coal-Fired Power Plant: Sejingkat Power | 2022 |
| 12 | Enhancement Of The Fire Fighting System At Sarawak Energy's Coal-Fired Power Plants : Balingian Power Generation | 2022 |
| 13 | Substation Extension Reinforcement Of Supply At Entinggan 275/132/33kv Substation | 2022 |
| 14 | Bakun Hydro-Engineering, Procurement, Construction And Commissioning Of Unit #1 Francis Turbine Runner | 2022 |
| 15 | Cadangan Pembangunan Lapangan Terbang Baru Bebuling, Spaoh, Betong | 2021 |
| 16 | Cadangan Membina Dan Menyiapkan Bangunan Pentadbiran Baru Bintulu Di Jepak, On Lot 101, Block 36, Kemena Land District, Bintulu, Sarawak | 2020 |
| 17 | Recoda Package 3 Proposed Farm Road At Brs , Algriculture Lot Sg Asap Section A Works | 2019 |
| 18 | Package 3 - Cadangan Menaiktaraf Jalan Ke Long Tangau Penempatan Semula Metalun Belaga (Fasa 1) | 2019 |
| 19 | Marudi Junction To Miri Airport 132kv Transmission Line | 2018 |