| 1 |
|
Tendering Schedule Service |
|
|
1.1 |
Tendering Schedule for Petros CGGT Earthworks Package |
2023 |
|
1.2 |
Marudi Junction Substation Slope Protection |
2023 |
|
1.3 |
Entinggan B 275kV Extension Substation |
2023 |
|
1.4 |
Tanjong Bako 275/132/33kV Substation Project |
2023 |
|
1.5 |
275kV Supply Scheme to Malaysia LNG (Stage 1) |
2023 |
|
1.6 |
Tendering Schedule for Sarawak Metro Rembus Interchange |
2022 |
|
1.7 |
The Appointment Of Detailed Design Consultant For The Development Of Kuching Urban Transportation System (Kuts), Kuching, Sarawak Line 1 And Line 2 |
2021 |
|
1.8 |
Kuching 132kV GIS Transmitting Substation |
2020 |
|
1.9 |
Kelantan Mini Hydro Station |
2020 |
|
1.10 |
Installation of the BorWin5 converter system, Germany |
2020 |
|
1.11 |
Samalaju B to PMB3 275kV Transmission Line |
2019 |
|
1.12 |
Tendering Schedule of JBALB SR1, CR1 and NR1 Projects |
2018 |
|
1.13 |
Limbang Town GIS Substation (275kV/33kV) Extension |
2018 |
|
1.14 |
Slope Protection Works for 500kV Transmission Line |
2018 |
|
1.15 |
Bunut to Medamit 275kV Transmission Line |
2018 |
|
1.16 |
Medamit to Limbang 132kV Transmission Line |
2018 |
|
1.17 |
Serudit to Sri Aman 132kV Transmission Line |
2018 |
|
1.18 |
Entinggan to Asajaya 132kV Transmission Line |
2018 |
|
1.19 |
Lawas Town 275kV Substation |
2018 |
|
1.20 |
Medamit to Lawas 275kV Transmission Line |
2018 |
|
1.21 |
Sg Merah 132kV/33kV GIS Substation and Sg. Maaw 132kV Extension |
2018 |
| 2 |
|
Preparation and Completion of Master Work Programme |
|
|
2.1 |
Recoda Package 4: Water Supply Projects In Bukit Goram / Ngemah / Machan / Pelagus / Baleh / Belaga / Murum |
2023 |
|
2.2 |
Pembinaan Gantian Penuh 6 Bilik Darjah Dan Lain-Lain Kemudahan Di Sk Rantau Panjang, Padawan, Sarawak |
2023 |
|
2.3 |
Cadangan Pembinaan Bangunan Tambahan 10 Bilik Darjah Dan Lain Lain Kemudahan Di Smk Padawan, Padawan Sarawak |
2022 |
|
2.4 |
Pembinaan Fasa Kedua Institut Kemahiran Islam Sarawak, Telaga Air |
2022 |
|
2.5 |
Package D3c: Proposed 7.0 Km New Single Carriageway Road Jkr R5 Standard Including Ground Improvement And Road Junctions, As Part Of Proposed Second Kuching-Samarahan Trunk Road, Kuching And Samarahan Division |
2022 |
|
2.6 |
Kerja-Kerja Menaiktaraf Sistem Bekalan Elektrikal Dan Kerja-Kerja Lain Berkaitan Di Hospital Lundu 1 |
2022 |
|
2.7 |
Cadangan Pembangunan Lapangan Terbang Baru Bukit Mabong, Kapit, Sarawak |
2021 |
|
2.8 |
Proposed Water Supply For Kanowit Phase 2 (Stage 2), Sibu Division. Proposed Pipeline From Salim Water Treatment Plant, Sibu Water Board To Kanowit, Sibu Division. |
2021 |
|
2.9 |
Package A5: Proposed Construction Of Highway From Batang Saribas Bridge (At Kuala Saribas) To Roban Interchange (At Pan Borneo Highway), Betong Division |
2021 |
|
2.10 |
Proposed Klinik Kesihatan (Jenis 3) Dengan Kuartes, Siburan |
2019 |
|
2.11 |
Cadangan Pembinaan Gantian Penuh 12 Bilik Darjah (200 Pelajar), Asrama Dan 12 Unit Rumah Guru Dan Lain-Lain Kemudahan Di Sekolah Kebangsaan Ulu Segan Di Lot 1365, Blok 37, Kemena Land District, Bintulu, Sarawak |
2018 |
|
2.12 |
Eastwood 132kv/33kv GIS Substation |
2018 |
| 3 |
|
Extension of Time Analysis, Application and Time Impact Report |
|
|
3.1 |
Propose Nanga Kesit - Ulu Lemanak - Enkari Road (Lubok Antu) Phase 1 |
2022 |
|
3.2 |
Similajau To Mapai 500kv Transmission Line Project |
2019 |
|
3.3 |
Pan Borneo Highway Wpc 04, Wpc 08, Wpc 10, Wpc 11 |
2019 |